![]() Josh can be reached at ĭepending on the availability of materials, CDOT anticipates construction of this signal will occur in summer/fall of 2023. Josh Breedlove is the CDOT Resident Engineer, and he will manage the project as it moves forward in a slightly new direction. This lack of funding influenced the type of traffic signal poles and other traffic signal elements that CDOT would allow to be used at the US 85 / Daniels Park Road intersection, and therefore this proposed type of traffic signal infrastructure will need to be left in-service much longer than the parties originally anticipated. The Colorado Department of Transportation (CDOT), rather than Douglas County, will plan, build and maintain the new signal.ĬDOT determined that Douglas County’s concept / idea of installing temporary traffic signal poles that use span wire to be unacceptable since CDOT considers the County’s approach / idea to be appropriate only as a short-term solution (for up to 4 years of service).ĬDOT does not have construction funding currently identified in its 10-year plan to complete the widening and reconstruction of US 85 between Sedalia (State Hwy 67) and Castle Rock Parkway. ![]() Ask a Question, Report Issues or ConcernsĪs of mid-September 2022, the project moved in a different direction.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |